Adhesive System
Adhesive Starter Track

- DPC membrane
- ProRend EIFS starter track
- Fixings at 600mm centres
Starter Track Mitre Corner

- Mitre corner
- Fixing 50mm from inside corner
Insulation Application

- 100% coverage of insulation panel using 10mm groove tiling trowel
- Insulation panels installed block bond
- Minimum stagger 150mm
- Mechanical fixings 10/m² in each corner of panel and centre
Aperture Planning

- Minimum 150mm stagger of insulant joints
- Avoid vertical or horizontal joints at corners of apertures
- Cut insulation panels to fit around aperture corners
- Ensure suitable quantity of mechanical fixings used around aperture
Corner Detail

- Ensure alternating blockbond at corner
Reveal Detail

- Insulation panels fitted around aperture to avoid horizontal and vertical joins at corners
- Face insulation panels fitted 20mm proud of blockwork at aperture
- 20mm insulation fillet fitted between face insulation and window frame to avoid cold bridge
- Joins in insulation fillet not coincident with joins in face insulation panels
- Adhesive bitumen sealtape fitted between insulation fillet and window frame to ensure watertight
Ventilation Services, Flue Pipe And Fixing Pattresses

- Fixing pattress made of 10mm render carrier board with insulation or solid timber
- Maximum dimensions: 300mm x 300mm
- Thickness of pattress to thickness of insulation
- Mechanically fixed back to substrate
- Avoid primary insulation joints within 150mm of fixing pattress
Ventilation Service

- Ventilation services fitted through centre of insulation panel without joints
Avoid ventilation service at edge of insulation panel

- Hot flue requires mineral fibre insulation (if primary insulant is EPS) around hot flue pipe
- Hot flue fitted through centre of insulation panel without joint
- For systems using EPS as primary insulant minimum distance of EPS from hot flue to be determined during system design
- Avoid hot flue at edge of insulation panel
Fire Barrier In EPS Systems

- Mineral Wool Lamella insulation fitted at floor level between EPS insulation panels
- Fire Barrier panels fitted block bond so joins alternate with EPS joins - minimum 150mm stagger
- Adhesive mortar used to rear of fire barrier panels - see figure 3
- Mechanical fixings used to secondary fix fire barrier panels to substrate
Fire Barrier Layout Between Adjacent Dwellings

» Go to the Render Application Page


