PRORend EIFS Adhesive System

Adhesive System

Adhesive Starter Track

Adhesive Starter  Track

  1. DPC membrane
  2. ProRend EIFS starter track
  3. Fixings at 600mm centres

Starter Track Mitre Corner

Adhesive Starter  Track

  1. Mitre corner
  2. Fixing 50mm from inside corner

Insulation Application

Adhesive Starter  Track

  1. 100% coverage of insulation panel using 10mm groove tiling trowel
  2. Insulation panels installed block bond
  3. Minimum stagger 150mm
  4. Mechanical fixings 10/m² in each corner of panel and centre

Aperture Planning

Adhesive Starter  Track

  1. Minimum 150mm stagger of insulant joints
  2. Avoid vertical or horizontal joints at corners of apertures
  3. Cut insulation panels to fit around aperture corners
  4. Ensure suitable quantity of mechanical fixings used around aperture

Corner Detail

Adhesive Starter  Track

  1. Ensure alternating blockbond at corner

Reveal Detail

Adhesive Starter  Track

  1. Insulation panels fitted around aperture to avoid horizontal and vertical joins at corners
  2. Face insulation panels fitted 20mm proud of blockwork at aperture
  3. 20mm insulation fillet fitted between face insulation and window frame to avoid cold bridge
  4. Joins in insulation fillet not coincident with joins in face insulation panels
  5. Adhesive bitumen sealtape fitted between insulation fillet and window frame to ensure watertight

Ventilation Services, Flue Pipe And Fixing Pattresses

Adhesive Starter  Track

  1. Fixing pattress made of 10mm render carrier board with insulation or solid timber
  2. Maximum dimensions: 300mm x 300mm
  3. Thickness of pattress to thickness of insulation
  4. Mechanically fixed back to substrate
  5. Avoid primary insulation joints within 150mm of fixing pattress


Ventilation Service

Adhesive Starter  Track

  1. Ventilation services fitted through centre of insulation panel without joints

Avoid ventilation service at edge of insulation panel

Adhesive Starter  Track

  1. Hot flue requires mineral fibre insulation (if primary insulant is EPS) around hot flue pipe
  2. Hot flue fitted through centre of insulation panel without joint
  3. For systems using EPS as primary insulant minimum distance of EPS from hot flue to be determined during system design
  4. Avoid hot flue at edge of insulation panel

Fire Barrier In EPS Systems

Adhesive Starter  Track

  1. Mineral Wool Lamella insulation fitted at floor level between EPS insulation panels
  2. Fire Barrier panels fitted block bond so joins alternate with EPS joins - minimum 150mm stagger
  3. Adhesive mortar used to rear of fire barrier panels - see figure 3
  4. Mechanical fixings used to secondary fix fire barrier panels to substrate

Fire Barrier Layout Between Adjacent Dwellings

Adhesive Starter Track


» Go to the Render Application Page

» Go to the Sundry Items Page

 
 
assets/Uploads/_resampled/SetWidth160-prorend-EIFS-adhesive.jpg